Amity Semester III Solved Assignment for Production & Operations Management |
|
University | Amity blog |
Service Type | Assignment |
Course | |
Semester | |
Short Name or Subject Code | Production & Operations Management |
Product | of Assignment (Amity blog) |
Pattern | Section A,B,C Wise |
Price | Click to view price |
Production & Operations Management
Assignment A
1. Discuss the Material Requirement planning.
Ans.
2. Differentiate between ABC and VED analysis.
Ans.
3. Explain EOQ.
Ans.
4. Discuss the PDCA cycle.
Ans.
5. Explain mass production system.
Ans.
6. Discuss different types of plant layout.
Ans.
7. Discuss JIT.
Ans.
8. Explain production planning and control.
Ans.
Assignment B
Case Detail:
EOQ applies only when demand for a product is constant over the year and each new order is delivered in full when inventory reaches zero. There is a fixed cost for each order placed, regardless of the number of units ordered. There is also a cost for each unit held in storage, commonly known as holding cost, sometimes expressed as a percentage of the purchase cost of the item.
We want to determine the optimal number of units to order so that we minimize the total cost associated with the purchase, delivery and storage of the product.
The required parameters to the solution are the total demand for the year, the purchase cost for each item, the fixed cost to place the order and the storage cost for each item per year. Note that the number of times an order is placed will also affect the total cost, though this number can be determined from the other parameters.
1. Discuss the parameters required to calculate EOQ.
Ans.
2. When can EOQ be implemented?
Ans.
3. Explain various costs associated with inventory.
Ans.
Assignment C
Question No. 1
…………...applies only when demand for a product is constant over the year and each new order is delivered in full when inventory reaches zero.
Options
EOQ
ABC
VED
FSN
Question No. 2
This is the variable cost of goods: purchase unit price × annual demand quantity.
Options
Purchase cost
Ordering cost
Holding cost
all of the above
Question No. 3
……………...is the planning of production and manufacturing modules in a company or industry
Options
production planning
production control
Both (a) & (b)
None of the above
Question No. 4
Production planning can be combined with production control into production planning and control, or it can be combined and or integrated into ………..
Options
ABC
EOQ
ERP
VED
Question No. 5
Production planning comprises of which of the following activities?
Options
Determination of the required product mix and factory load to satisfy customers needs
Matching the required level of production to the existing resources
Scheduling and choosing the actual work to be started in the manufacturing facility
all of the above
Question No. 6
………... is the activity of monitoring and controlling any particular production or operation.
Options
production planning
production control
Both (a) & (b)
None of the above
Question No. 7
This is the cost of placing orders: each order has a fixed cost K, and we need to order D/Q times per year.
Options
Purchase cost
Ordering cost
Holding cost
all of the above
Question No. 8
It is also known as Facilities Planning and Layout.
Options
Plant
production control
plant mayout
plant layout
Question No. 9
If all the processing equipment and machines are arranged according to the sequence of operations of the product, the layout is called...
Options
Product or Line Layout
Process or Functional Layout.
Fixed Position Layout.
all of the above
Question No. 10
In this type of layout, only one product of one type of products is produced in an operating area.
Options
Product or Line Layout
Process or Functional Layout.
Fixed Position Layout.
all of the above
Question No. 11
This layout is particularly useful where low volume of production is needed.
Options
Product or Line Layout
Process or Functional Layout.
Fixed Position Layout.
all of the above
Question No. 12
It is an engineering study used to analyze different physical configurations for a manufacturing plant
Options
Plant
production control
plant mayout
plant layout
Question No. 13
It is a "set of actions and decision taken during production to regulate output and obtain reasonable assurance that the specification will be met."
Options
production planning
production control
Both (a) & (b)
None of the above
Question No. 14
In this type of layout, the machines and not arranged according to the sequence of operations but are arranged according to the nature or type of the operations.
Options
Product or Line Layout
Process or Functional Layout.
Fixed Position Layout.
all of the above
Question No. 15
……...is an Internet-enabled, often Web-based application that acts as a mechanism for business to manage and procure staffing services – temporary, and, in some cases, permanent placement services – as well as outside contract or contingent labor.
Options
ABC
EOQ
JIT
VMS
Question No. 16
The average quantity in stock (between fully replenished and empty) is Q/2, so this cost is h × Q/2
Options
Purchase cost
Ordering cost
Holding cost
all of the above
Question No. 17
An effective MPS
Options
Give production, planning, purchasing, and management the information to plan and control manufacturing
Tie overall business planning and forecasting to detail operations
Enable marketing to make legitimate delivery commitments to warehouses and customers
all of the above
Question No. 18
MPS issues:
Options
Width of the time bucket
Planning horizon
Rolling plan
all of the above
Question No. 19
In this type of layout the major component remain in a fixed location, other materials, parts, tools, machinery, man power and other supporting equipment’s are brought to this location.
Options
Product or Line Layout
Process or Functional Layout.
Fixed Position Layout.
all of the above
Question No. 20
………...is a methodology aimed primarily at reducing flow times within production as well as response times from suppliers and to customers.
Options
ABC
EOQ
JIT
VED
Question No. 21
…………….is a plan for individual commodities to be produced in each time period such as production, staffing, inventory, etc
Options
MPS
ABC
EOQ
JIT
Question No. 22
A…………. is a person or organization that vends or sells contingent labor.
Options
vendor
customer
company
all of the above
Question No. 23
This layout is commonly suitable for non repetitive jobs.
Options
Product or Line Layout
Process or Functional Layout.
Fixed Position Layout.
all of the above
Question No. 24
It is the most effective physical arrangement, either existing or in plans of industrial facilities i.e. arrangement of machines, processing equipment and service departments to achieve greatest co-ordination and efficiency of 4 M’s (Men, Materials, Machines and Methods) in a plant.
Options
Plant
production control
plant mayout
plant layout
Question No. 25
It utilizes the resource allocation of activities of employees, materials and production capacity, in order to serve different customers.
Options
production planning
production control
Both (a) & (b)
None of the above
Question No. 26
This type of layout is used in the manufacture of boilers, hydraulic and steam turbines and ships etc.
Options
Product or Line Layout
Process or Functional Layout.
Fixed Position Layout.
all of the above
Question No. 27
…………...is the process of determining the production capacity needed by an organization to meet changing demands for its products
Options
production control
plant mayout
plant layout
capacity planning
Question No. 28
Effective capacity is the maximum amount of work that an organization is capable of completing in a given period due to constraints such as
Options
quality problems
delays
material handling
all of the above
Question No. 29
IT capacity planning involves
Options
estimating the storage
computer hardware, software
connection infrastructure resources
all of the above
Question No. 30
Demand for an organization's capacity varies based on
Options
changes in production output
increasing or decreasing the production quantity of an existing product
Both (a) & (b)
None of the above
Question No. 31
Better utilization of existing capacity can be accomplished through improvements in overall …….. effectiveness
Options
equipment
class
product
all of the above
Question No. 32
………….. can be increased through introducing new techniques, equipment and materials, increasing the number of workers or machines, increasing the number of shifts, or acquiring additional production facilities.
Options
control
management
Capacity
all of the above
Question No. 33
…….. strategy is adding capacity in anticipation of an increase in demand.
Options
lag
pull
push
lead
Question No. 34
A large capacity does not necessarily imply…... inventory levels, but it can imply higher cycle stock costs.
Options
low
zero
high
two
Question No. 35
…………. strategy refers to adding capacity only after the organization is running at full capacity or beyond due to increase in demand
Options
lag
pull
push
lead
Question No. 36
Typical features of a VMS application include
Options
order distribution,
consolidated billing
significant enhancements in reporting capability
all of the above
Question No. 37
This plan quantifies significant processes, parts, and other resources in order to optimize production, to identify bottlenecks, and to anticipate needs and completed goods.
Options
MPS
ABC
EOQ
JIT
Question No. 38
…………... strategy is an aggressive strategy with the goal of luring customers away from the company's competitors by improving the service level and reducing lead time.
Options
lag
pull
push
lead
Question No. 39
……..strategy is adding capacity in small amounts in response to changing demand in the market
Options
match
lag
pull
push
Question No. 40
………. strategy is adding or reducing capacity in small or large amounts due to consumer's demand, or, due to major changes to product or system architecture.
Options
attachment
match
lag
pull